Introduction
This document explains where to install the different steel fingers in the correct locations for FD230 and FD235 headers. A
list of parts included in each kit is provided in Chapter 2 Parts List, page 5.
Installation time
Installation time for this kit is approximately 3 hours.
Conventions
The following conventions are used in this document:
• Right and left are determined from the operator’s position. The front of the header is the side that faces the crop; the
back of the header is the side that connects to the combine.
• Unless otherwise noted, use the standard torque values provided in the header operator’s manual and technical
manual.
NOTE:
This document is currently available in English only.
215505 i Revision A