EasyManua.ls Logo

MacDon FlexDraper FD235 - Introduction; Installation Time Estimate; Document Conventions

MacDon FlexDraper FD235
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Introduction
This document explains where to install the different steel fingers in the correct locations for FD230 and FD235 headers. A
list of parts included in each kit is provided in Chapter 2 Parts List, page 5.
Installation time
Installation time for this kit is approximately 3 hours.
Conventions
The following conventions are used in this document:
Right and left are determined from the operators position. The front of the header is the side that faces the crop; the
back of the header is the side that connects to the combine.
Unless otherwise noted, use the standard torque values provided in the header operators manual and technical
manual.
NOTE:
This document is currently available in English only.
215505 i Revision A

Related product manuals