EasyManua.ls Logo

Manitowoc 31000

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 31000 LUFFING JIB OPERATOR MANUAL
4-12 Published 07-23-15, Control # 078-03
11
Information below from drawing A19443, Sheet 9:
Attach the jib strut to the #90 boom:
Use an assist crane (see Figure 4-13
) to align the jib strut butt (A) with the #90 boom top (B).
Install the jib strut hinge pin (C), luffing jib hinge pin (D), and link (E). The arrow (H) on the jib strut hinge pin (C)
shall point towards the crane.
Attach an end plate (F) and swivel hook (G) to the end of the jib strut hinge pin (C).
Step Action
Item Description
A Jib strut butt.
B #90 boom top.
C Jib strut hinge pin.
D Luffing jib hinge pin.
E Link.
F End plate.
G Swivel hook.
H Arrow.
FIGURE 4-12
A
B
C
D
E
C
F
G
E
The end plate (F) for the luffing jib hinge pin is
attached in a later step (see Figure 4-53
).
The luffing jib hinge pin (C) is installed now to
prevent the jib strut hinge pin from rotating.
H

Table of Contents

Related product manuals