EasyManua.ls Logo

Manitowoc 31000

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 07-23-15, Control # 078-03 4-49
31000 LUFFING JIB OPERATOR MANUAL SET-UP AND INSTALLATION
4
Assemble the Luffing Jib and Attach to #90 Boom
Step Action
51
Information below from drawing A19443, Sheet 24:
Remove jib backstay straps (D) and luffing jib straps (E) from the reinforced jib insert (B).
Use an assist crane (A) to attach the 6 m (19.7 ft) reinforced jib insert (B) to the jib butt assembly (C).
Install connector pins (F) per drawing A18701, sheet 7.
FIGURE 4-51
Item Description
A Assist crane.
B Reinforced jib insert.
C Jib butt assembly.
D Jib backstay strap.
E Luffing jib strap.
F Connector pins.
A
BC DE
F (top)
F (bottom)

Table of Contents

Related product manuals