EasyManua.ls Logo

Manitowoc 31000

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 07-23-15, Control # 078-03 4-9
31000 LUFFING JIB OPERATOR MANUAL SET-UP AND INSTALLATION
4
Set Up #90 Boom
Step Action
8
Information below from drawing A19443, Sheet 8:
On the #90 boom, lower the wire rope roller assemblies (A) to their working position (C):
Item Description
A Wire rope roller assembly.
B Stowed position of wire rope roller
assembly pins.
C Working position of wire rope roller
assembly pins.
A
B
C
FIGURE 4-9
Support wire rope roller assembly
while lowering, or damage may occur.

Table of Contents

Related product manuals