SET-UP AND INSTALLATION 31000 LUFFING JIB OPERATOR MANUAL
4-2 Published 07-23-15, Control # 078-03
PRE-INSTALLATION CHECKLIST
Step Done? Checklist item
1
Read GENERAL SAFETY in Section 4 of the 31000 Operator Manual.
2
Read CRANE ORIENTATION in Section 4 of the 31000 Operator Manual.
3
Read RIGGING DRAWINGS in Section 4 of the 31000 Operator Manual.
4
Read ASSEMBLY AND DISASSEMBLY NOTES in Section 4 of the 31000 Operator Manual.
5
Read ASSEMBLY AND DISASSEMBLY AREA in Section 4 of the 31000 Operator Manual.
6
Read ACCESSING PARTS in Section 4 of the 31000 Operator Manual.
7
Read PERSONNEL FALL PROTECTION in Section 4 of the 31000 Operator Manual.
8
Read HANDLING COMPONENTS in Section 4 of the 31000 Operator Manual.
9
Read RETAINING CONNECTING PINS in Section 4 of the 31000 Operator Manual.
10
Read ASSEMBLY/DISASSEMBLY TOOLS in Section 4 of the 31000 Operator Manual.
11
Read ASSIST CRANE REQUIREMENTS in Section 4 of the 31000 Operator Manual.
12
Read AERIAL WORK PLATFORM in Section 4 of the 31000 Operator Manual.
13
Read CRANE WEIGHTS in Section 4 of the 31000 Operator Manual.
14
Read HOSE AND CABLE CLEANLINESS in Section 4 of the 31000 Operator Manual.
15
Read PIN AND CONNECTING HOLE CLEANLINESS in Section 4 of the 31000 Operator Manual.
16
Read TIGHTENING HYDRAULIC COUPLERS in Section 4 of the 31000 Operator Manual.
17
Read SYMBOLS in Section 4 of the 31000 Operator Manual.
18
Read TOOLS in Section 4 of the 31000 Operator Manual.
19
Read SHIPPING DATA in Section 4 of the 31000 Operator Manual.
20
Read SHIPPING CRANE COMPONENTS in Section 4 of the 31000 Operator Manual.
21
Read PRE-START CHECKS — PORTABLE HYDRAULIC POWER UNIT in Section 4 of the 31000
Operator Manual.