EasyManua.ls Logo

Manitowoc 31000

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 31000 LUFFING JIB OPERATOR MANUAL
4-58 Published 07-23-15, Control # 078-03
Raise the Luffing Jib
Step Action
63
Information below from drawing A19443, Sheet 25:
Position the dolly:
Use straps to attach an assist crane (A) to the jib top tubes (B).
Raise the #91 luffing jib (C) high enough to place the jib top in the dolly cradle (D).
NOTE: Before using the dolly, prepare it as described in Section 4 of the 31000 Operator Manual.
FIGURE 4-61
Item Description
A Assist crane.
B Jib top tube.
C #91 luffing jib.
D Dolly cradle.
E Upper boom point.
Dolly Configuration for #91 Luffing Jib Lengths less than 72 m (236.2 ft)
Dolly Configuration for #91 Luffing Jib Lengths equal to greater than 72m (236.2 ft)
A
Sling attachment
lifting points
C
D
A
C
D
E
E
B
B

Table of Contents

Related product manuals