MAINTENANCE AND LUBRICATION GRT880 SERVICE MANUAL
9-22
Published 10/19/2017, Control # 618-00
Boom
NOTE: Crane Setup: Machine shall be set up on firm level surface with fully extended outriggers and 9979 kg (22,000 lb)
counterweight installed. Ensure crane is level.
Boom must be directly over the front with house lock engaged.
Set boom angle at zero degrees (0°).
All lubrication points can be accessed by operating crane in the 0001 RCL mode using B boom configuration.
CAUTION: Do not operate crane in RCL bypass to lubricate the boom.
Item
Lube Point
Description
Figure No.
Approved
Lubricant
Lube Capacity Lube Interval Application
80
Hook Block
Swivel Bearing
Figure 9-11 A
Until grease
extrudes.
250 hours or 3 months. 3 grease fittings.
81
Hook Block
Sheaves
Figure 9-11 --- --- 250 hours or 3 months.
Inspect.
See note
immediately below.
NOTE: Rotate sheaves and check for rough or dry operation. Look for grease leakage. Replace sheave if either is found.
82 Headache Ball
Figure 9-11 A
Until grease
extrudes.
250 hours or 3 months. 1 grease fitting.
FIGURE 9-11
8603
8604
80
80
81
82
82
8604-1
Reference Only

Table of Contents

Other manuals for Manitowoc Grove GRT880

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GRT880 and is the answer not in the manual?

Manitowoc Grove GRT880 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GRT880
CategoryConstruction Equipment
LanguageEnglish

Related product manuals