RT765E-2 SERVICE MANUAL HYDRAULIC SYSTEM
2
Published 9-04-2014, Control # 422-08
HYDRAULIC ACCUMULATOR
Description
The hydraulic accumulators are located inside the
superstructure on the left side under the main hoist. The
purpose of each accumulator is to provide stored energy, an
oil volume of 122 in
3
(1.99 l) at a maximum pressure of
2000 psi (13,800 kPa), to actuate the service brake circuits.
The dual accumulator charge valve regulates flow to the
hydraulic accumulators to provide fully powered
independently separate, primary (front) and secondary
(rear), service brake circuits.
Each accumulator has two chambers divided by a piston.
One side is pre-charged to 900 psi (6200 kPa) with high
purity nitrogen. This maintains a constant pressure in the
other chamber which is connected to the modulating brake
valve. After the accumulators are fully charged, they will
provide the necessary brake system flow and pressure to
actuate the brakes.
The accumulator consists of a piston, seals, gas valve, and a
gas valve guard.
Maintenance
Removal
1. With the engine shutdown, deplete the hydraulic
pressure in the accumulators by depressing the service
brake pedal several times.
2. Tag and disconnect the hydraulic hose from the
accumulator. Cap or plug the line and port.
3. Remove the two nuts securing each clamp half. Remove
the each clamp half and accumulator from the turntable.
Installation
1. Position the accumulator in the clamps and secure with
the removable clamp halves and nuts.
2. Connect the hydraulic hose to the port on the
accumulator as tagged during removal.
3. Pre-charge the accumulator. Refer to Procedure H -
PreCharging The Accumulator, page 2-27.
4. Start the engine and check accumulator and hoses for
leaks. Make repairs as needed.
5. Depress the brake pedal several times, make several
turns with the steering wheel, and swing the
superstructure left and right. Verify the brakes, swing,
and front steering work properly.
Servicing
The pre-charge nitrogen pressure should be checked every
200 hours or once a month, whichever comes first. Refer to
Procedure G - Accumulator Pre-Charge Pressure, page 2-
26.
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT765E-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT765E-2 and is the answer not in the manual?

Manitowoc Grove RT765E-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT765E-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals