EasyManua.ls Logo

Manitowoc QuietQube SD0672C

Manitowoc QuietQube SD0672C
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part Number 80-1505-3 6/11 221
RECOVERY/EVACUATION PROCEDURES
1. Place the ICE/OFF/CLEAN toggle switch in the
OFF position and disconnect all power to the ice
machine and condensing unit.
2. Install manifold gauges, charging scale, and
recovery unit or two-stage vacuum pump.
3. Open the receiver service valve halfway.
4. Open high and low side on the manifold gauge
set.
5. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Pressure test the system.
C. Evacuation prior to recharging: Evacuate to
500 microns. Then allow the pump to run for
an additional hour.
6. Refer to Charging Procedures.

Table of Contents

Related product manuals