Unit subjects to floor installation must be placed on a concrete slab. The slab must have thickness of 100mm and 50mm
wider and longer than the footprint of the unit (Figure 5). Place the concrete slab a distant from building to prevent
vibration and noise.
In the case of heatpump operation with an outdoor temperature below 0°C, the unit must be installed at least 300mm above
ground level. This is necessary to prevent ice from accumulating on the frame and to permit proper operation in the event
of heavy snowfalls.
The unit must be leveled on both axes. (Tolerance is less than 2mm per meter.)
Figure 5: For floor installation
Note: All units are in mm unless specified.
500
1000
1000 500
1500
Figure 4: For multiple unit installation
AIR FLOW
AIR FLOW
AIR FLOW
AIR FLOW
AIR FLOW
AIR FLOW
AIR FLOW
MIN 500
50 50
100

Table of Contents