Page 3-4
May 2005 1532ES / 1932ES Operators Manual
PRESTART INSPECTION
THIS INSPECTION MUST BE COMPLETED BEFORE MACHINE
USE EACH DAY OR AT THE BEGINNING OF EACH SHIFT.
FAILURE TO DO SO COULD RESULT IN DEATH OR SERIOUS
INJURY.
User/Operator is responsible for the Pre-Start Inspection.
Keep inspection records up-to-date.
Record and report all discrepancies to your supervisor.
MODEL NUMBER____________ SERIAL NUMBER_________________
INITIAL DESCRIPTION
________ 1. Perform a visual inspection of all machine components, i.e. missing
parts, torn or loose hoses, hydraulic fluid leaks, torn or disconnected
wires, damaged tires etc. Replace components as necessary.
________ 2. Check the hydraulic fluid level with the platform fully lowered.
________ 3. Check the tires for damage. Check wheel lug nuts for tightness.
________ 4. Check the hoses and the cables for worn areas or chafing.
Replace if necessary.
________ 5. Check the platform rails and safety gate for damage.
________ 6. Check the pivot pins for security.
________ 7. Check that all warning and instructional labels are legible and secure.
________ 8. Inspect the platform control. Ensure the load capacity is clearly marked.
________ 9. Check the hydraulic system pressure (See Machine Specification). If the
pressure is low, determine the reason and repair in accordance with
accepted procedures as outlined in the service manual.