EasyManua.ls Logo

Mec 4046SE - Pre-Start and Frequent Inspection Checklists

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 34 SE
AC
Slab Series - Operator’s Manual
November 2022Section 9 - Maintenance
Pre-Start Inspection Checklist
The operator must conduct a Pre-Start Inspection of the machine before each work shift.
DO NOT use a damaged or malfunctioning machine.
Initial Description
Be sure that the operators manual are complete, legible and in the storage container located in the platform.
Be sure that all decals are legible and in place. See Decals section.
Check for hydraulic oil leaks.
Check for battery uid leaks.
Check the following components or areas for damage, improperly installed or missing parts and unauthorized
modications:
Electrical components, wiring and electrical cables
Battery connections
Hydraulic hoses, ttings, cylinders and manifolds
Battery pack and connections
Drive motors
Slide blocks/wear pads
Tires and wheels
Ground strap
Limit switches, alarm and beacon
Nuts, bolts and other fasteners
Platform entry gate
Beacons and alarms
Maintenance Lock
Platform extension
Scissor pins and retaining fasteners
Platform control handle
Brake release components
Pothole guards
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Be sure that all structural and other critical components are present and all associated fasteners and pins are in place and
properly tightened
Be sure that guard rails are properly installed and secured, and that all pins and bolts are properly fastened.
Be sure that the chassis trays are closed and latched and the batteries are properly connected.
NEVER perform work or inspection on the machine with the platform
elevated without rst blocking the scissor assembly with the
Maintenance Lock. See page 24 for instructions.

Other manuals for Mec 4046SE

Related product manuals