12
NOTE: the foot pedal is provided with
enables it to be moved to the most
appropriate place for use, with no need
to touch it with hands.
4
Insert the solution bag stand into the
proper holes;
5
Install the two peristaltic pumps, gently
pushing the head of the peristaltic pump
towards the corresponding base (on the
two parts match;
6
Pull the pump gently to ensure that it is
correctly positioned.
7
CLICK!