EasyManua.ls Logo

Metrohm NIRS DS2500 - 3.6 Initial Start-up

Metrohm NIRS DS2500
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.6 Initial start-up
■■■■■■■■■■■■■■■■■■■■■■
12
■■■■■■■■
3.6 Initial start-up
The initial start-up of the instrument is always carried out with the Vision
software.
This manual contains a short overview of the required steps. You can find
detailed information on the procedure in the tutorial for the software.
Non-regulated indus-
tries
If you put the NIRS DS2500 Analyzer into operation in a non-regulated
industry, carry out the following steps:
1. Switch on the computer.
2. Launch the software and log in.
3. Switch on the instrument and wait until the software has recognized
the instrument.
4. Create a new project.
5. Create a Data Collection Method (DCM).
6. Calibrate the instrument as follows:
a. Run Wavelength Certification.
b. Run Reference Standardization.
c. Run Instrument Calibration.
7. Run Performance Test.
Running "Wavelength Certification" and "Reference Stan-
dardization"
Required accessories
NIRS reflection standard, 2 pcs. (6.7450.000)
NIRS DS2500 holder for sample cup (6.7430.040)
1
Place the sample cup holder onto the sampling window.

Related product manuals