EasyManua.ls Logo

MG Windsor EV - Page 224

MG Windsor EV
249 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
Month
6
Months
1
Year
2
Years
3
Years
4
Years
5
Years
6
Years
7
Years
8
Years
9
Years
10
Years
OPERATION / PROCESSES FOR
PERIODIC SERVICE SCHEDULE
Replacement
Frequency: Km /
Year whichever
is earlier
1000
5000
15000
30000
45000
60000
75000
90000
105000
120000
135000
150000
Check the marking for fitting the
mounting bolt to see if it is moved
and ensure the bolts are fastened.
Inspection only I I I I I I I I I I I I
Check the appearance of housing
(including the bracket) for crack or
deformation.
Inspection only I I I I I I I I I I I I
Check the appearance of high-
voltage battery pack grounding wire
and replace it as necessary.
Inspection only I I I I I I I I I I I I
Vehicle Interior and Exterior
Check the equilibrium state of the
high-voltage battery pack and carry
out equalizing charge as necessary.
Inspection only I I I I I I I I I I I I
Check the status and thickness
of front and rear brake pads and
brake discs, and replace them as
necessary.
Inspection only I I I I I I I I I I I I
Check brake pipes and hoses for
condition and security. Ensure that
hoses are not twisted or kinked.
Inspection only I I I I I I I I I I I I
Check the wheel bearings and drive
shaft sleeve.
Inspection only I I I I I I I I I I I I
Check the suspension and steering
system for leakage or wear.
Inspection only I I I I I I I I I I I I
Check the tread depth to see
if the tyre is worn or damaged
abnormally. Check the four-wheel
alignment data and perform
front and rear wheel rotation as
appropriate.
Inspection only I I I I I I I I I I I I
Check the tyre pressure and make
adjustment as necessary.
Inspection only I I I I I I I I I I I I
Check if the chassis and
underbody bolts and nuts are
fastened or fixed, and replace them
as necessary.
Inspection only I I I I I I I I I I I I
Periodic Maintenance - Service Schedule - Windsor
PERIODIC MAINTENANCE
Symbol Abbreviation: R - Replace • I - Inspect- Top up if require-Adjust-Clean-Refill. Check the coolant level and top up as required, replace
if it is contaminated/discoloured or there is sludge formation.
** Tightening of underbody fasteners, door adjustments and functional checks of all the systems during every service is mandatory - Check
5
R e p a i r & M a i n t e n a n c e
5-46

Table of Contents

Related product manuals