MCAC-VTSM-2015-09      R410A All DC Inverter V4+S Series 60Hz 
Installation                                                                                                                                                                                                        117 
5) Vacuum drying shall be conducted from liquid and gas pipe simultaneously. There are a lot of functional 
parts like valves, which could shut down the gas flow midway. 
11.2. 2 Special vacuum drying 
Special vacuum drying method shall be adopted when: 
1) Discovery of moisture during refrigerant piping flush. 
2) Conducting construction on rainy day, because rain water might penetrated into pipeline. 
3) Construction period is long, and rain water might penetrated into pipeline. 
4) Rain water might penetrate into pipeline during construction. 
Procedures of special vacuum drying are as follows: 
a. First stage vacuum drying 2 hours. 
b. The second vacuum damage, charging nitrogen to 7.1PSI(0.5kgf/cm
2
). 
Because nitrogen is dry, vacuum damage could achieve the effect of vacuum drying, but this method cannot 
sufficiently dry the system when there is too much moisture. Therefore, it is crucial to ensure that moisture 
does not enter the system and condensation does not form. 
c. Second stage vacuum drying 1 hour. 
Vacuum drying is confirmed complete when vacuum degree is under -14.6PSI(-755mmHg); if the vacuum 
degree is still above -14.6PSI(-755mmHg) within 2  hours drying,  please repeat the procedures of “vacuum 
damage---vacuum drying”. 
d. Vacuum placement test: when the vacuum degree reaches -14.6PSI(-755mmHg), keep for 1 hour. If the 
vacuum  gauge  indicator  does  not  increase,  the  process  is  complete.  If  the  vacuum  gauge  increases,  it 
indicates of moisture or a leak. 
12. Additional refrigerant charge 
12.1 Operation procedure for recharging refrigerant 
12.1.1 Operation procedure 
Calculate the required refrigerant volume by the length of liquid pipe → recharge refrigerant. 
※The refrigerant volume from factory does not take into consideration actual installation piping length. 
12.1.2 Steps for recharging refrigerant 
1. Make sure vacuum drying is qualified before recharging refrigerant. 
2. Calculate the required refrigerant volume by the diameter and the length of liquid pipe. 
3. Use electronic scale or fluid infusion apparatus to weigh the recharged refrigerant volume. 
4.  Use  soft  pipe  to  connect  refrigerant  cylinder,  pressure  gauge,  and  examine  valve  of  outdoor  unit.  And 
recharge in liquid mode. Before recharging, clear the air in the soft pipe and pressure gauge’s pipe. 
5. After recharge is finished, using gas leak detector or soap water, inspect for refrigerant leakage in expansion 
part of indoor and outdoor units. 
6. Write the recharged refrigerant volume in the indicating plate of outdoor unit. 
Caution 
1) The recharged refrigerant volume must be calculated according to  the  formula in the outdoor technical 
reference manual. Calculation cannot be made according to running current, pressure and temperature as 
current and pressure will change depending on the difference of temperature and length of pipeline. 
2) In cold temperature, use warm water and hot air to warm up refrigerant storage cylinder. 
12.1.3 Recharging R410A refrigerant 
If R410A refrigerant is adopted, confirm the following items before recharging: 
1) R410A refrigerant compatible vacuum pump with one-way valve. 
2) R410A refrigerant compatible pressure gauge. 
3) R410A refrigerant compatible recharging soft pipe and connector. 
4) Charging method: Recharge in liquid phase.