10-1
10 Storage and Transport
10.1 Storage
Storage for longer than 6 months:
1. Drain and blow off the vaporizer (See 4.3 Draining the Vaporizer and 4.4 Blowing off the
Vaporizer).
2. Turn the control dial to “0”. The vaporizer handle for locking lever and interlock device are
in their original positions.
3. If packing is necessary, see 10.2 Transport.
4. Observe storage temperature. See A Product Specifications. If storage temperature range is
exceeded, internal damage may occur which could cause incorrect output concentration.
Before putting into operation again, carry out all-round inspection first.
NOTE
z When the anesthetic vaporizer is not in use for a long period of time, use the plug to
block the gas inlet and outlet.
z If the anesthetic vaporizer is stored in high temperature and then used, the
concentration of the delivered anesthetic agent may be high. To enable pressure
equalization, always turn the control dial to 1% after connecting the anesthetic
workstation, and wait for at least 15 seconds.