EasyManuals Logo

Mira Advance Installation Guide

Mira Advance
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
26
1306246-W2-A
Turn the temperature control to the full
hot position and continue to run the
shower for at least 1 minute.
This completes the installation of the Mira Advance shower. Please advise the user
how to operate their new shower and leave them with the quick start guide and User
instruction guide.
Post Installation Procedure (Continued)
Turn on the electrical
supply.
Turn the temperature
control to number 8.
Turn on the power to appliance,
check Start/Stop for white light.
Note! The shower will beep 3
times if set to BEAB mode
8 9 10
Start the shower to test for water ow.
The shower will beep once (3 times
when set in BEAB mode) and the white
start stop and orange status light (green
in BEAB Mode) will pulsate. Wait until
the lights go solid and the shower will
beep again
Push Start/Stop to turn off appliance.
Pulsing start/stop light and "beep"
indicates that appliance is shutting down.
Appliance will purge water from heater
tank for a few seconds.
Important! DO NOT isolate power until
water has stopped.
11
12
13 14

Other manuals for Mira Advance

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mira Advance and is the answer not in the manual?

Mira Advance Specifications

General IconGeneral
Temperature ControlThermostatic
Warranty2 Years
Power Ratings9.8 kW
Water Connection15 mm
Outlet Connection1/2"
Water Pressure0.7 - 10 bar
Cable Entry PointsBottom entry
Safety FeaturesOverheat protection
ApprovalsWRAS

Related product manuals