EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R-R04CPU - Memory Copy with the Engineering Tool

Mitsubishi Electric MELSEC iQ-R-R04CPU
1028 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
640
37 FUNCTIONS
37.3 Memory Copy from Control System to Standby System
Memory copy with the engineering tool
The following describes the execution procedure of memory copy using the engineering tool.
Execution procedure
1. Connect the engineering tool to the control system CPU module.
2. Open the "Redundant Operation" window of the engineering tool.
[Online] [Redundant PLC Operation] [Redundant Operation]
3. On the control system CPU module of memory copy source, a user with the Administrator access level of the user
authentication function logs on. (Execute the memory copy only in the logged on state.)
4. Select "Memory Copy" in the "Redundant Operation" window and click [Execute]. During the memory copy, the
MEMORY COPY LEDs of the redundant function modules in both systems flash (at 200ms intervals).
5. When the memory copy is completed, the MEMORY COPY LED of the control system turns off and that of the standby
system turns on.
6. Turn off and on or reset the standby system CPU module. The MEMORY COPY LED of the standby system turns off.
Control system Standby system
Control system Standby system
Control system Standby system

Table of Contents

Related product manuals