Operating states of the PLC
67
04/99 AWB 2700-1311 GB
Using the programming software on the PC;
In slave mode, if the master switches to “Run”
and you have set the “Remote control” function
to “ON” in the Sucosoft topology configurator.
Not Ready
The user program is not executed in the “Not Ready”
state.
The PLC is switched to “Not Ready”:
In response to a hardware error or
In response to a serious error in the user program
(e.g. cycle time violation).
Once the error has been rectified and acknowledged,
the “Not Ready” can be cancelled as follows:
By pressing the reset button; if the operating
mode selector switch is set to “Run M reset”, the
PLC will switch to “Run” status;
By switching the power supply off and on again;
if the operating mode selector switch is set to
“Run M reset”, the PLC will switch to “Run”
status;
Using the programming software on the PC.
H1311g.bk Seite 67 Freitag, 4. Juni 1999 1:12 13