Starting the PLC with a
memory module plugged in
71
04/99 AWB 2700-1311 GB
PC
r memory module
Switch off the PLC and plug in the memory
module.
Switch on the PLC. The PLC must be set to
“Ready” or “Not Ready”.
Transfer the program from the PC to the memory
module (see the “Test and Commissioning”
section of the “Sucosoft S 40 user interface”
manual, AWB 2700-1305-GB).
Starting the PLC with a
memory module
plugged in
Follow the steps given below if you wish to start the
PS 4-300 with a memory module already plugged in:
Switch off the PLC and plug in the memory
module. The operating mode selector switch can
be set to any position.
Switch on the PLC. Any program in the memory
module will be transferred to the PS 4-300 and
the PLC will run with the set start conditions:
If there is a program in the memory module, any
program in the PLC will be overwritten.
H1311g.bk Seite 71 Freitag, 4. Juni 1999 1:12 13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Moeller PS 4-341-MM1 and is the answer not in the manual?

Moeller PS 4-341-MM1 Specifications

General IconGeneral
BrandMoeller
ModelPS 4-341-MM1
CategoryController
LanguageEnglish

Related product manuals