EasyManua.ls Logo

Mooney M20R - Elevator; Vertical Stabilizers

Default Icon
360 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICE
AND
MAINTENANCE
MANUAL
M20R
MOONEY
AIRCRAFT
CORPORATION
7
1
I
1
3
6
1--/
5
DETAIL
A
AaP
ATOR
FIGURE
55-2
55-10-02
HORIZONTAL
STABILIZER
55-20-02
ELEVATOR
INSTALLATION
INSTALLATION
Refer
to
Section
53-40-02
for
installation.
CAUTION
Each
new,
repaired
or
repainted
elevator
should
be
55-20-00
ELEVATOR
checked
for
balance
per
Section
27-91-00.
Elevators
on
the
M20R
consist
of
left
and
rightj
hand
The
elevators
are
installed
in
reverse
order
of
assemblies
attached,
through
ball
bearing
fittin~s
(1),
removal.
Nominal
torque
values
for
AN3
bolts
are
to
rear
spar
of
horizontal
stabilizer
(Figure
55-2).:
to
be
used
(see
Section
5-20-01
for
torque
table.)
The
elevator
control
horn
(2)
is
connected
to
inpoard
55-30-00
VERTICAL
STABILIZER
leading
edge
of
each
elevator
(R.H.
and
L.H.).I
Both
control
horns
are
then
connected
to
elevator
flighft
con-
The
main
spar
assembly
(1)
~Fig.
55-3)
Is
formed
from
tros
belscrank.
The
full
length
trim
tab
(3)
may
riot
be
aluminum
sheet.
Formed
angle
doublers
(2)
are
nested
re-adjusted
from
factory
installed
setting.
This
is
fiectory
inside
main
spar
channel
and
riveted
to
spar
web.
Rear
set
at
70
down.
spar
(3)
is
an
extrusion
used
to
attach
aft end
of
sec-
The
elevator
skins
~4)
are
stretch-formed
for
uppgr
and
tioned
ribs
(4).
Stub
spar
(5)
is
also
formed
from
sheet
lower
surface
of
elevator.
There
are
no
ribs
in
el$vator
aluminum.
A
doubler
channel
(6)
is
attached
to
vertical
between
inboard
and
outboard
ribs.
The
skins
dre
at-
stabilizer
stub
and
stub
spar
of
horizontal
stabilizer.
tached
to
leading
edge
extrusion
(5)
and
ribs
(6b
with
This
attach
channel
is
securely
bolted
to
stinger
blind
rivets.
Each
formed
corrogation
is
match$d
on
bulkhead
brackets.
The
main
spar
doublers
and
angles
top
and
bottom
skins
and
rivets
are
installed
for
(7,
8
and
9)
provide
attach
points
for
stinger
and
strength
and
rigidity
through
each
corrogation,
horizontal
stabilizer
spar.
(Figure
55-3).
A
lead
balance
weight
(7)
is
installed
in
each
el~vator
Skins
(10)
are
stretch-formed
in
2
sections
and
riveted
tip
with
iron
rivets
or
bolts
(8).
(Figure
55-2).
Sec)
Sec-
to
ribs
and
spar.
tion
27-96-00
for
balancing
procedures
on
elevatoi~s.
The
rudder
attach
fittings
(11)
are
mountedto
rear
spar
55-20-01
ELEVATOR
REMOVAL
extrusion
to
attach
rudder
(12).
Lead
weights
(13)
are
added
for
dampening.
Remove
AN3
bolts
from
each
control
horn
and
’push-
pull
tube
bearing,
then
remove
AN3
bolts
and
hatajware
55-30-01
VERTICAL
STABILIZER
REMOVAL
from
each
hinge
fitting
on
both
elevators.
The
vertical
and
horizontal
stabilizer
are
removed
as
a
unit
with
stinger
assembly.
Remove
fairing
located
on
tailcone
which
covers
gap
between
tailcone
and
em-
pennage.
Section
53-40-02
describes
attaching
points
for
complete
empennage
assembly.
Refer
to
this
sec-
tion
for
removal
of
empennage
assembly
from
airplane.
55-10-02
Island Enterprises

Table of Contents