Pre Start Inspection and Operation
3.10
Machine Shut-down
To safely shut the machine down, the operator must:
1. Park the machine on a solid, level area.
2. Lower the loader arm and attachment to the ground.
3. Idle the engine for 5 - 10 minutes to allow the machine to cool down.
4. Shut o the engine.
5. Clean o any accumulated mud and/or dirt from the machines operating surfaces, i.e.
operator’s platform, both track assemblies, etc.