Fuel
– Prefilter
– Differential pressure gauge - Check and adjust‐
ment 105
– Draining 106
– Filter element replacement 109
– Flushing 107
Fuel filter
– Replacement 103
Fuel prefilter
– Differential pressure gauge
– Check and adjustment 105
– Draining 106
– Filter element
– Replacement 109
– Flushing 107
Fuel system
– Venting 101
Fuel – Draining 100
G
General conditions 5
H
HP fuel line
– Pressure pipe neck replacement 98
HT coolant pump
– Relief bore check 135
I
Injection pump
– Removal and installation 90
– Replacement 89
Injector
– Removal and installation 94
– Replacement 93
Inspection port cover
– Explosion hazard 12
Intercooler
– Checking condensate drain line for coolant discharge
and obstruction 111
L
LOP
– Cleaning 152
– Connector cleaning 152
– Controls (without Blue Line automation system) 50
– Test procedures 155
– Visual inspection 153
LOP alarms 70
M
Main engine dimensions 49
Maintenance work
– Safety regulations 13
MTU contact persons 160
O
Oil dipstick
– Marking 120
Operation
– Safety regulations 11
Operational checks 57
P
Personnel and organizational requirements 6
Plant
– Cleaning 65
Pressure pipe neck
– Replacement 98
Product description 19
Putting the engine into operation (out-of-service-period >
3 months) 52
Putting the engine into operation after scheduled out-of-
service period 53
R
Raw water pump
– Relief bore check 137
Repair work
– Safety regulations 13
Resilient mounts
– Condition check 142
S
Safety instructions 18
Safety regulations 11, 13
Service partners 160
Start interlock limit switch
– Check 147
Starter
– Condition check 117
Starting the engine from LOP (without Blue Line automa‐
tion system) 54
Startup
– Safety regulations 11
Stopping the engine at the BlueLine automation system
(control stand) 62
Stopping the engine from LOP (without Blue Line auto‐
mation system) 61
T
Transport 7
Troubleshooting 67
U
Universal shaft
– Greasing 143
V
Valve clearance
– Adjustment 85
– Check 85
Venting points 126
166 | Appendix B | MW15407/14E 2012-02
DCL-ID: 0000015775 - 001