EasyManuals Logo

Mueller SENTRY II Installation Operation & Maintenance

Mueller SENTRY II
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Sentry II with Water Works Box Operating Instructions Effective April 1, 2000
Part No. 8823728 Revised November 10, 2003
2.9 Bulk Head Installations
If the milk cooler is bulkheaded through a wall, the wall must be free-standing and not load bearing
against the milk cooler. Mueller offers an optional steel-formed structural support channel that may be
installed in masonry walls to prevent the wall from bearing load on the milk cooler. Contact Mueller’s
Sales Department for availability and pricing.
A weather shield kit, Part No. 93750, is required for agitator(s) that are located exterior of the milk
house wall. See Figures 5 and 8, and Section 2.11 for additional installation instructions.
Figure 5 - Agitator Weather Shield
Figure 6 - Basic Bulk Head Installation
7

Table of Contents

Other manuals for Mueller SENTRY II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mueller SENTRY II and is the answer not in the manual?

Mueller SENTRY II Specifications

General IconGeneral
BrandMueller
ModelSENTRY II
CategoryController
LanguageEnglish

Related product manuals