EasyManuals Logo

Mueller SENTRY II Installation Operation & Maintenance

Mueller SENTRY II
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
Sentry II with Water Works Box Operating Instructions Effective April 1, 2000
Part No. 8823728 Revised November 10, 2003
2.10 Milk Room Installations
Ensure proper clearances between the milk cooler and other obstacles or equipment as required by the
regulations in your locality. Special attention should be placed on floor drain locations, high-traffic and
working areas, and ease of access for the operators.
The milk cooler parts box includes two stainless steel brackets to secure the water/chemical fill line to
the rear head of the milk cooler, Part Nos. 8823254 (top) and 8823253 (bottom). Each bracket is
supplied with 1.125" rubber grommets, which provides a method to support the water/chemical fill
hose inside of .75" PVC conduit. See Figure 7.
Figure 7 - Milk Room Installations
8

Table of Contents

Other manuals for Mueller SENTRY II

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mueller SENTRY II and is the answer not in the manual?

Mueller SENTRY II Specifications

General IconGeneral
BrandMueller
ModelSENTRY II
CategoryController
LanguageEnglish

Related product manuals