EasyManua.ls Logo

National Instruments FieldPoint FP-2000 - Page 92

National Instruments FieldPoint FP-2000
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index
© National Instruments Corporation I-5 FP-2000/2010/2015 User Manual
launching VIs at system startup, 5-6, 5-10
Publish Data VI, 3-23
runaway startup applications, C-4
serial VIs, 3-23
specifying download path, 5-6
specifying target with command line
arguments, 5-7
TCP, 3-23
UDP VIs, 3-23
LabWindows/CVI software, 3-18
LED indicators, 4-4
power-on self test (POST), 2-15, 4-5
LINK LED, 4-5
local bus connector, protective cover (figure),
2-6, 2-10
Lookout software, 3-16
M
100 Mbps LED, 4-5
memory specifications, E-1
modules. See FP-20xx hardware; I/O modules
monitoring I/O channels, 3-14
mounting hardware on DIN rail. See
installation, mounting hardware on DIN rail
mounting hardware to a panel. See installation,
mounting hardware to a panel
N
National Instruments
calibration certificate, F-2
customer education, F-1
Declaration of Conformity, F-1
professional services, F-1
system integration services, F-1
technical support, F-1
worldwide offices, F-2
network module. See FP-20xx hardware
network security settings, 3-12
network specifications, E-1
network watchdog, 4-1
network. See Ethernet network
O
online technical support, F-1
OPC client, 3-19, 3-20
OPC server, 3-19, 3-20
overview
FieldPoint software, 1-3
FP-20xx hardware, 1-1
setup, 1-4
using FP-20xx from host
applications, 3-16
P
panel mount. See installation, mounting
hardware to a panel
password, locking/unlocking configuration in
Remote System Explorer, 3-13
password-protected resets, 3-4, B-1
phone technical support, F-2
physical characteristic specifications, E-2
pollution degree, 2-2
power connections
calculating power for FieldPoint
bank, 2-14
figure, 2-14
wiring, 2-13
POWER LED, 4-4
power requirement specifications, E-1
power supply, 2-13
power-on self test (POST), 2-15, 4-5
power-up
launching LabVIEW RT applications at
system startup, 5-6, 5-10
overview, 2-15
runaway startup applications, C-4
power-up state, configurable, 4-3

Table of Contents

Related product manuals