EasyManua.ls Logo

NEC Express5800 120Lh - Page 221

NEC Express5800 120Lh
314 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Upgrading Your Server 9-9
Installation
Follow these steps to install the air duct.
1. Holding the internal cables clear, place the air duct into the chassis.
2. Adjust the air duct until the tab on the right end of the duct is aligned with the slot on the
chassis.
3. Reinstall the side cover.
Insert the frame into
the hook on the
chassis.

Table of Contents

Related product manuals