CHAPTER 6 INSTALLATION, PROGRAMMING, AND MAINTENANCE
UNIVERGE NEAX 2000 IPS General Description Page 148
Issue 5
AC Power Requirements
DESCRIPTION SPECIFICATIONS
AC Input Voltage 90 to 132Vac or 180 to 264Vac; 47 to 64Hz
AC Input Current 3.5A(at 100V), 2.0A(at 200V)
Installation
The following items are required for correct operation.
a.) Adequate space accommodation
b.) Adequate ventilation
c.) Commercial AC power
Main Equipment
The installation of the UNIVERGE
NEAX 2000 IPS is comprised of up to 8 Port Interface
Modules (PIMs). A PIM provides 13 card slot for Common Control, Line/Trunk (LT), and
Application Porcessors (AP) cards. It also houses an AC/DC Power Supply, DC/DC Power
Supply (for –48V), and batteries for protection from short-term (about 30 minutes) power
interruption.
Cabling inside the unit, between the switching equipment and the MDF, can all be done by plug-
and-jack connections, while printed circuit cards can easily be plugged into the edge connectors.
On all installations, a special provision for plug-and-jack connections completely eliminates
possible errors in wiring. This allows the installation to be done easily and smoothly.
Mounting Circuit Cards
(1) Before mounting the circuit cards, confirm the following items.
Wrist Strap is connected to Frame Ground.
Switch settings of circuit cards are already completed.
The “SW1” switches of all PZ-PW121 cards are turned off.
(2) Mount circuit cards into their mounting positions according to the “Bay Face Layout” and
“Port Assignment Table” given in the Office Data Programming Manual.
Various installation Methods
To meet the specific needs of the customer's environment, UNIVERGE
NEAX
2000 IPS provides
the following installation methods:
Floor Standing Installation
Wall-mounting Installation
IEC standard 19 inch Rack-mounting Installation