CHAPTER 2 SYSTEM CONFIGURATION
UNIVERGE NEAX 2000 IPS General Description Page 27
Issue 5
Installation Methods
The UNIVERGE NEAX 2000 IPS provides three installation methods as follows:
Floor Standing Installation
Wall Mounting Installation
19-inch Rack Mounting Installation
Floor Standing Installation
In Floor Standing Installation, the UNIVERGE
NEAX 2000 IPS is comprised of up to 8 Port
Interface Modules (PIMs).
PIM #3
PIM #2
PIM #2
PIM #1
PIM #1
PIM #1
PIM #0 PIM #0 PIM #0 PIM #0
BASE
BASE
BASE
BASE
(64 ports)
(128 ports)
(192 ports)
(256 ports)
PIM #3
PIM #3
PIM #3
PIM #3 PIM #7
PIM #2
PIM #2
PIM #2 PIM #6
PIM #2 PIM #6
PIM #1 PIM #1 PIM #5 PIM #1 PIM #5 PIM #1 PIM #5
PIM #0 PIM #4
PIM #0 PIM #4
PIM #0 PIM #4
PIM #0 PIM #4
BASE BASE
BASE BASE
BASE BASE
BASE BASE
(320 ports)
(384 ports)
(448 ports)
(512 ports)
Figure 2-2 System Configuration in Floor-standing Installation