EasyManua.ls Logo

NPK GH2 - Before Starting the Hammer; Daily Start-Up Procedure

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 19 -
ATTENTION
START-UP OPERATION
BEFORE STARTING THE HAMMER
PRE-OPERATION INSPECTION AND WARM UP
Before operating the NPK HYDRAULIC HAMMER, be sure to perform the specified
ROUTINE INSPECTION, see page 26.
Warm up the NPK HYDRAULIC HAMMER, see below, and the base machine in
accordance with the machine manufacturer’s instruction manual. This is especially
important during cold weather operation.
DAILY START-UP PROCEDURE
Operate the NPK HYDRAULIC HAMMER in the vertical position, at 3/4 engine throttle
setting, for about 1-2 minutes. During this period, inspect the NPK HYDRAULIC
HAMMER and INSTALLATION KIT for leaks or loose connections.
Do not operate on a
slanted surface during the
start-up operation.

Other manuals for NPK GH2

Related product manuals