EasyManua.ls Logo

NPK GH2 - DISCHARGING GAS PRESSURE DETAILS

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 41 -
GAS CHARGE
DISCHARGING THE GAS PRESSURE
PROCEDURE
Remove the valve cap only, not the charge valve assembly!
5. Tighten the charging
adapter cap (g6).
6. Turn the T-handle (g2)
clockwise. As the T-
handle is screwed in, a
resistance is
encountered. By turning
the T-handle (g2)
further, the nitrogen gas
pressure will be
indicated on the
pressure gauge (g8).
Stop turning the T-
handle when the gauge
reads pressure. Do not
over tighten.
7. Loosen the charge adapter
cap (g6) VERY SLOWLY.
The gas pressure will
gradually decrease to
zero; then REMOVE THE
CAP.
8. Remove the charge
adapter (g1) from the
hammer.
9. Remove NPK adapter
part no. 30604100.
10. Install existing plug.

Other manuals for NPK GH2

Related product manuals