EN
37
Electronic version
Connecting the LLS fuel level sensors
Connection of the LLSfuel level sensor should be performed
according to the scheme (Figure 15).
Connection of the several Omnicomm LLS-AF fuel level sensor
should be performed in a due order starting from the 1st universal
input.
Figure 15. Scheme of connection of the LLSfuel level sensor
Figure 16. Scheme of connection of the LLS-AF fuel level sensor