20
Startup Procedure Section 1-4
Connector Assembly
XS2R-D427-5 T-joint
SRS2-1 Shield Terminator Plug (male)
SRS1-T Terminal-block Terminator
1-4 Startup Procedure
The standard procedure for starting up the CompoBus/S System is as follows:
Selecting Master and
Slave
Select the Master and Slaves according to the following items.
• PLC model being used (Refer to
1-3-1 Compatible Masters and SECTION
4 Master Unit Specifications and Operations
.)
• Number of Slaves (Refer to 1-3-1 Compatible Masters)
• Maximum I/O points (Refer to
1-3-1 Compatible Masters)
• Slave I/O types (Refer to
1-3-2 Slave Units and SECTION 5 Slave Speci-
fications and Operations
)
Determining the
Communications Mode
Determine the communications mode according to the following items.
• Communications distance (Refer to
2-2-2 Maximum Cable Length)
• I/O response time (Refer to
2-5 I/O Response Time Characteristics)
Determining System
Configuration
Determine the CompoBus/S System configuration according to the following
items. Select the devices required for connection (such as connectors, termi-
nal blocks, and terminators) according to the system configuration.
Socket (Female)
(Crimp terminals/Solder terminals)
XS2C-D4S7 (Communications)
XS2C-D4
((
(Power supply and I/O)
Plug (Male)
(Crimp terminals/Solder terminals)
XS2G-D4S7 (Communications)
XS2G-D4
((
(Power supply and I/O)
Plug (male)Socket (female)
Socket (female)
Socket (female) Plug (male)
Plug (male)
Mounting Holes
Two, 4.2 dia. or M4
40 20
21
20
30±0.2