EasyManua.ls Logo

Omron C200HW-SRM21-V1 - 08-2007 - Operations Checklist

Omron C200HW-SRM21-V1 - 08-2007
423 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70
Operations Checklist Section 3-5
and press the cover straight into the connector plug. There should not be
any gap between the cover and plug.
Inserting and Removing
Cable Connectors
The sensor cable can be inserted into the Sensor Terminal once the cable
connector has been attached.
Inserting the Cable Connector
Position the cable connector so that Terminal 1 faces you and push the con-
nector into the Sensor Terminal until it clicks into place.
Removing the Cable Connector
To remove the cable connector, first pull out the lock lever and then remove
the cable connector, as shown in the following diagram.
3-5 Operations Checklist
Go through the items in the following checklist before turning ON the Units in
the CompoBus/S System. All of the checks should be answered “Yes.
Lock lever
Item Check Answer
CS-series,
C200HX/C200HG/
C200HE-(Z)E, and
C200HS Master
Units
Switch settings Has the Master’s Special I/O Unit unit number been set?
(Refer to 4-1-2 Switch Settings for details.)
Ye s N o
Has the node number been set with pin 1 of the DIP switch?
(Refer to 4-1-2 Switch Settings for details.)
Ye s N o
Has the communications mode been set with pin 2 of the DIP switch?
(Refer to 4-1-2 Switch Settings for details.)
Ye s N o
Are pins 3 and 4 of the DIP switch all set to OFF? Yes No

Table of Contents

Related product manuals