7. EtherNet/IP Connection Procedure
10
7.1. Work Flow
Take the following steps to operate the tag data link for EtherNet/IP.
7.2. Setting Up the PLC
Set up the PLC.
7.2.1. Hardware Settings
Set the hardware switches on the PLC and wire
the network.
7.2.2. Starting the CX-Programmer
and Connecting Online with the
PLC
Start the CX-Programmer and connect online with
the PLC.
7.2.3. Parameter Settings
Create the I/O table for the PLC and set the IP
address.
7.3. Setting Up the Controller
Set up the Controller.
7.3.1. Starting the Sysmac Studio and
Importing the Project File
Start the Sysmac Studio and import the Sysmac
Studio project file.
7.3.2. Connecting Online and
Transferring the Project Data
Connect online with the Sysmac Studio and
transfer the project data to the Controller.
7.4. Setting Up the Network
Set the tag data links for the EtherNet/IP.
7.4.1. Opening the Network
Configuration File and
Connecting Online
Open the Network Configurator v3 network
configuration file and connect online with the
Controller.
7.4.2. Transferring the Tag Data Link
Parameters
Transfer the tag data link parameters to the
Controller.
7.5. Checking EtherNet/IP
Communications
Confirm that the EtherNet/IP tag data links are
operated normally.
7.5.1 Checking the Connection Status
Check the connection status of EtherNet/IP.
7.5.2 Checking the Data that are Sent
and Received
Confirm that the correct data are sent and
received.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron CJ2 Series and is the answer not in the manual?

Omron CJ2 Series Specifications

General IconGeneral
BrandOmron
ModelCJ2 Series
CategoryController
LanguageEnglish

Related product manuals