73
SECTION 5
Trial Operation to Actual Operation
A connection test can be performed on each branch output in Test Mode.
After installing the S8M, wiring, and setting the parameters, the connection test can be used to test operation before actual
operation.
When the S8M is shipped from the factory, all branch outputs are disconnected. The branch outputs that are being used
must be connected in Test Mode.
5-1 Test Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
5-2 Connection/Disconnection Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
5-3 Checking Sequence Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
5-4 Run Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78