EasyManua.ls Logo

Omron Sysmac CJ Series - Page 27

Omron Sysmac CJ Series
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Connection Procedure
10
The dialog box on the right is
displayed. Click the Yes Button.
11
Check that the CX-Programmer
and the PLC are normally
connected online.
*The icon
is selected
during online connection.
Additional Information
If the CX-Programmer and PLC are not connected online, please check the connection of the
cable. Or, return to step 5 and check the settings that were set in steps 6 to 8 and try to
connect them again.
Additional Information
The dialogs explained in this document may not be displayed depending on the
environmental setting of CX-Programmer.
This document explains the setting procedure when the setting item "Confirm all operations
affecting the PLC" is selected.
24

Related product manuals