7. Connection Procedure
40
ct Data
. Transferring the Proje7.1
E that serial communications are normally performed.
xecute the program and confirm
Confirm safety sufficiently before monitoring power flow and present value
status in the Ladder Section window or when monitoring present values in
the Watch window. If force-set/reset or set/reset operations are
inadvertently performed by pressing short-cut keys, the devices connected
to Output Units may malfunction, regardless of the operating mode of the
CPU Unit.
Precautions for Correct Use
Please confirm that the LAN c
procedure.
If it is not connected,
able is connected before proceeding to the following
turn OFF the power to the devices, and then connect the LAN cable.
7.1.1. Starting the Trace Operation
Start the trace operation with the CX-Protocol.
1
Select Operating Mode –
f Monitor from the PLC Menu o
the CX-Protocol.
2
The dialog box on the right is
displayed. Click the Yes Button.
3
Confirm th g mode
was chan
at the operatin
g d to Monitor mode
and double-c
e
lick
NewPLC1.
4
The NewPLC1 tree is
expanded. Select the Serial
Communications Unit (SCU[0] in
the right figure).