EasyManua.ls Logo

OMS LINEA ESSE - Post Installation Check Operation

OMS LINEA ESSE
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OMS LINEA ESSE S.T.01/3S ED.0 REV.14 03/2017
70
POST INSTALLATION CHECK OPERATION
Note:
During post installation check, make sure that mechanical stability, like floor attachment
screws, cuspidor and doctor arm assembly, attachment screws must be checked, while
movements are done (assistant arm, light, cuspidor, etc.). If the chair cannot be fastened to
the floor, stabilizer elements are available.
Check the main and water connections pipes.
Check the drain and suction connections pipes.
Check the main voltage and grounding connections.
Adjust the internal air and water pressure if needed.
Check the rinsing bowl and cup fill flown.
Check the operation of the suction system.
Check the operation of the foot control.
Check the operation of the safety switches.
Check the friction of the arms joint, adjust if needed,
Check the function of all keyboard buttons.
Check the operation of turbine.
Check the operation of micromotor.
Check the operation curing lamp.
Check the operation Scaler.
Visually check the condition of the chair and upholstery.
Check the programming function and general operation.
Check the operation of the emergency switches and backrest safety
Check the operation of the headrest locking mechanism.
Note:
The equipment is equipped with a general water tap. During use, the tap should be open. At
the end of the work day, the tap should be closed or, alternatively, close the unit’s general
supply tap in the surgery.

Other manuals for OMS LINEA ESSE

Related product manuals