EasyManua.ls Logo

Oneida Air Systems Supercell - Page 23

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FIG. 19a
FIG. 19b
FIG. 19c
G17
G16
Closed
Open
oneida-air.com 21
18
Install the Barrel Gasket (G2) onto the
rounded, bottom edge of the Motor Assembly
(A). e Barrel Gasket (G2) should be oriented
so that the "ribbed" side is facing downwards
[FIG. 18].
Assembly Instructions (Continued)
19
Using pliers, squeeze and open the Double
Spring Clamp (G17) and slip it onto the
shorter end of the Tubing Assembly (G16A).
en, with the clamp still open, slide the Tube
Assembly (G16) onto the vent tube near the
Cyclones (E) inlet, closing the Spring Clamp
once the hose is fully seated [FIG. 19a].
Note: If you are not using the automatic bag
holding feature of the system, the Switch Valve
(G16B) of the Tube Assembly MUST be in the
closed position [FIG 19b]. Otherwise leave the
Tube Assembly in the open position [FIG 19c].
FIG. 18
G2
A
DO NOT TURN ON OR PLUG IN YOUR DUST COLLECTOR UNTIL INSTALLATION IS COMPLETED.
NEVER RUN THE SYSTEM WITHOUT THE MOTOR COWLING IN PLACE.

Related product manuals