current switch or at the connection in the control cabinet must be exchanged. The
guarantee will become null and void if the machine is connected incorrectly.
3.10 Warming up the machine
ATTENTION!
If the lathe and in particular the lathe spindle are immediately operated at maximum load
when cold, this may result in damages.
If the machine is cold, e.g. directly after having transported the machine, it should be warmed
up at a spindle speed of only 500 1/min for the first 30 minutes.
3.11 Functional check
Check that all spindles are running smoothly.