EasyManua.ls Logo

Panasonic SA-PM53E - Page 114

Panasonic SA-PM53E
209 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Insert a cassette tape to the unit.
4. Supply DC9V to the plunger, and turn the power ON and OFF. (
Power +PL, -PL) (Fig. 5)
A. FWD PLAY: Supply the plunger power in a flash. (ON: approx.
5msec)
B. FWD FF: Supply the plunger power in a flash at PLAY mode. (ON:
approx. 5msec)
C. STOP: Supply the plunger power in a flash at FWD FF mode. (ON:
approx. 5msec)
D. REV PLAY: Supply the plunger power in a normal timing at STOP
mode. (ON: approx. 200msec)
E. REV REW: Supply the plunger power in a flash at REV PLAY mode.
(ON: approx. 50msec)
F. STOP: Supply the plunger power in a flash at FF mode. (ON: approx.
50msec)
Repeat the operation ( FWD PLAY)
(Note) Other operation may start if a timing of supplying the plunger
power is missed.
11.1.1. Connection Status between Mechanism and Power Supply (Motor, Plunger)
11.1.2. Operative Parts of Mechanism Unit (EJECT lever fitted with rubber band, /
Plunger/Rib operation)
Fig. 6
114

Related product manuals