EasyManua.ls Logo

PEDROLLO DG PED 3 - Page 23

PEDROLLO DG PED 3
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23ENGLISH |
n
Regulate the levelling feet to
correctly level the DG PED.
o
Remove the covers of the forks.
p
Remove the forks.
q
Insert the elbow tting complete
with O-RING.
r
Correctly insert the forks.
s
Insert the fork covers.
The aspiration tube must have
a minimum diameter of 1" and it must
be tightly sealed.
An expansion vessel can be added to the installation mounted on the delivery side (OUT)

Table of Contents

Related product manuals