EasyManua.ls Logo

Pentair FLECK 3900 NXT - Programming; 6.1. Display

Pentair FLECK 3900 NXT
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 3900 - NXT - Programming
Ref. MKT-IM-015 / B - 08.06.2018 57 / 126
6. Programming
6.1. Display
6.1.1. During service
6.2. Commands
Note
At any time, press D to return to the home screen without saving.
Note
Menus are displayed in a defined and incremental order.
1. System type → #4: single valve;
→ #5: lockout system, 2 to 4 valves;
→ #6: parallel system, sequential regenerations, 2 to 4 valves;
→ #7: duplex alternating system, 2 valves;
→ #9: alternating system, 2 to 4 valves;
→ #14: demand system, 2 to 4 valves.
2. Valve address → #-: single valve;
→ #1: address 1, lead valve;
→ #2: address 2;
→ #3: address 3;
→ #4: address 4.
3. Valve status → CHG (change of state): lower drive changes position on double piston
valve;
→ INI (initializing): after a power failure or a change in the programming,
the controllers initializes for approximately 30 seconds;
→ RGQ (regeneration queued): in a meter delayed system, the reserve
capacity has been entered or a manual regeneration has been
registered;
→ LCK (lock): the controller has acquired the lockout signal;
→ SRV (service): valve in service;
→ SBY (standby): valve in standby.
4. Flow indicator → rotates when flow is going through the meter.
5. Time of the day
6. Operating mode → remaining volume in volumetric mode;
→ remaining days before regeneration in timeclock mode.
7#1 SRV* 08:26HR
VOLUME 20000L
12 3 4 5
6

Table of Contents

Related product manuals