EasyManua.ls Logo

Pentair FLECK 5800 XTR2 - MASTER SETTINGS PROGRAMMING; USB Connection for Field Programming; Error Log and Parameter Details

Pentair FLECK 5800 XTR2
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Press the screen navigation arrows at the upper-right and
left of the screen to view each diagnostic parameter.
Press the Error Log button
to access the Error Log
screen. To clear the Error Log, press the Reset button
then the Reset button again on the Clear All Error Logs
screen, then enter "1201" at the password prompt screen,
then press the Accept button to confirm.
Figure 32 Error Log Screen
Press the Home button
to return to the Home screen.
NOTE: If a regeneration occurs while in the Diagnostic screen,
the unit will return to the main screen.
Parameter Description
Flow Rate Displays the current flow rate.
Peak Flow Displays maximum flow rate of water along
with date and time of occurrence, since last
reset.
Totalizer Displays total volume of water used since
last reset.
Last Regen Displays when last regeneration occurred.
Reserve Displays the reserve volume based on the
reserve type selected under master settings.
*This parameter is only available for meter
delayed regeneration type.
Software Version Displays the software version installed on
the controller.
No of Regens Displays how many manually and system
initiated regenerations the system has gone
through since last reset.
Regen Interval Displays the average length of time between
regenerations based on the past four
regenerations.
Daily Usage Displays average water usage for each day of
the week based on the usage on that day for
the past six weeks.
Usage Since Regen Displays water usage since last regeneration.
Last Setting Change Displays the date and time of the last update
to Master Settings.
NOTE: Only Peak Flow and Totalizer can be changed - they can be
reset to zero.
NOTE: Totalizer has a maximum value of 99,999,999. If this
number is reached, the Totalizer must be reset to zero to
continue tracking this value.
USB Connection for Field Programming
The XTR2 features a USB port that allows you to connect a PC
to the control for field programming and diagnostic parameter
download.
NOTE: Field Programmer software is required for field
programming features. See XTR2 Field Programmer
Manual for more information on using the Field
Programmer software.
Pressing
on the Format screen displays the USB screen.
Figure 33 USB Screen
When the USB screen appears, connect a USB cable to the
USB port on the control circuit board. Connect the other
end of the USB cable to a PC with the Field Programmer
software installed and follow the directions in the XTR2 Field
Programmer manual to complete the connection. Press
to
return to Master Settings.
NOTE: Do not remove USB cable from computer or control
while connected and transferring data. See the XTR2
Field Programmer manual for proper disconnection
procedure.
MASTER SETTINGS PROGRAMMING
continued
16 • FLECK 5800 XTR2 Service Manual
262.634.2386 | greatlakesintl.com

Other manuals for Pentair FLECK 5800 XTR2

Related product manuals