Posi-Chlor® Salt Water Chlorinator Owner’s Manual
10
3. INSTALLATION OF THE EQUIPMENT
3.3 Mounting of the Control Centre
• It is highly recommended that the control centre unit be installed where it is protected
from the elements. Although inherently protected from rain (IP rated), continued expo-
sure to rain and sunlight will accelerate the aging of the unit.
• It should also be mounted in a position where it is away from accidental water spray.
• The unit should be installed so that adequate air ow can circulate freely around the
control centre and allow it to perform eciently.
• The control centre is to be mounted at least 800mm above ground level.
• If the control centre is installed in an enclosed room, acid and other chemical containers
should not be present in the same room, unless the room is adequately ventilated.
1. A printed template is included in the Posi-Chlor kit. Place the template on the wall where
you wish to mount the control centre.
2. Using a pencil or pen, mark the position of the four mounting holes.
3. Drill holes in the wall using a suitable drill bit for the wall material (e.g. timber, brick, plas-
terboard, fibre-cement).
4. Insert plugs into holes for all wall types except timber.
5. Insert screws with screwdriver until screw head is approximately 5mm from the wall.
6. Place Posi-Chlor power centre over the four screws taking care to line up with the
mounting holes.
7. Let the power centre drop to lock into the slots above mounting holes.
3.4 Connection of pH peristaltic pump kit
Once the equipment from section 3.2 and 3.3 is installed, the following connections should
be done.
1. Place the saddle clamp (6) on the pipe as indicated in the hydraulic connection diagram
(3.6.3). The saddle clamp corresponds to the injector and should be connected after the
electrolysis cell. Make sure the o-ring is in the groove on the top of the clamp, sealing
the pipe to the saddle clamp.