Always transport the cooling units using the packaging provided by the factory. It comprises an outer carton, base
plate and padding at the top and base.
Transporting cooling units
Requirements
- Cooling units must be in the packaging provided by the factory.
Required tools and material
- Lashing straps, loading crane, if applicable
Procedure
Secure correctly for transport with lashing straps. Always transport in the position of use.
Always raise cooling units by the housing.
Always raise cooling units slowly and evenly and set down safely.
The cooling unit was transported and loaded correctly.
The cooling unit can also be loaded using M8 jack rings; for this purpose, the M8 jack rings are first screwed
into the cooling unit; see Mounting M8 jack ring.
3.2 Storage
• Do not expose the cooling unit to temperatures above +70 °C during storage.
• Always store the cooling unit in the position of use.
The warranty will no longer apply if these instructions are not observed.