Do you have a question about the Pfisterer MV-CONNEX 3 and is the answer not in the manual?
Type | MV-CONNEX 3 |
---|---|
Application | Medium Voltage Connections |
Voltage Level | Medium Voltage |
Rated voltage | Up to 42 kV |
Rated current | Up to 630 A |
Operating temperature | -40°C to +70°C |
Standard | IEC 60840 |
Connector System | Plug-in |
Insulation level | 170 kV (BIL) |
Weight | Varies by configuration |
Short-circuit current | Up to 25 kA (1s) |
Instructions related to the inner cone component during installation.
Introduction to the MV-CONNEX dry pluggable connection system for medium voltage networks.
Details on silicone as a key material in medium voltage engineering and its benefits.
Information regarding the proper use, understanding, and accessibility of installation instructions.
Overview of the sections covered within the installation instructions document.
Information on the confidentiality and protection of installation instructions content.
Manufacturer's liability, warranty provisions, guarantee terms, and spare parts policy.
Covers intended use, operator responsibility, and product modification restrictions.
Addresses risks, workplace safety, and qualifications for personnel.
Guidelines for necessary personal protective equipment during installation and operation.
Information on checking delivery contents against the packing list.
Details on the predominant packaging materials and disposal guidelines.
Rules for storing products, including temperature, humidity, and environment.
Information regarding the recommended storage duration for the product.
Guidelines for environmentally sound disposal of product components.
Lists tools necessary for assembly and disassembly.
Lists recommended tools and accessories for specific installation tasks.
Details on round crimp tools and compression sleeves for cable termination.
Technical specifications including dimensions, weight, and cable parameters.
Electrical and performance characteristics of the product.
Diagram and labels identifying product configuration parts.
Criteria for checking cable eccentricity and flattening to ensure compatibility.
Initial steps for positioning the cable and preparing it for installation.
Detailed steps for cable preparation, including peeling and chamfering.
Detailed step-by-step instructions for assembling the connector components.
Procedure for connecting the earthing point of the system.
Specific requirements for installing the connector vertically from above.
Instructions for using an additional sealing kit for offshore or ground applications.
Specific steps for dealing with thick conducting layers during installation.
Step-by-step instructions for safely removing the connector.
Required fittings and procedure for mounting a blind cap for testing purposes.
Procedures for setting up commissioning tests and performing sheath testing.
Describes different options for single earthing connection based on network design.
Steps for safely unplugging the connector from the socket.
Steps for correctly plugging the connector into the socket.