EasyManua.ls Logo

Pfisterer MV-CONNEX 3 User Manual

Pfisterer MV-CONNEX 3
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
I
n
s
t
a
l
l
a
t
i
o
n
I
n
s
t
r
u
c
t
i
o
n
s
r
e
a
d
y
t
o
h
a
n
d
n
e
a
r
t
h
e
p
r
o
d
u
c
t
MV-CONNEX Size 3 + 3-S wire screen
INSTALLATION INSTRUCTIONS
Inner cone
Take note of any additional instructions
prior to installation!!!
Question and Answer IconNeed help?

Do you have a question about the Pfisterer MV-CONNEX 3 and is the answer not in the manual?

Pfisterer MV-CONNEX 3 Specifications

General IconGeneral
TypeMV-CONNEX 3
ApplicationMedium Voltage Connections
Voltage LevelMedium Voltage
Rated voltageUp to 42 kV
Rated currentUp to 630 A
Operating temperature-40°C to +70°C
StandardIEC 60840
Connector SystemPlug-in
Insulation level170 kV (BIL)
WeightVaries by configuration
Short-circuit currentUp to 25 kA (1s)

Summary

INSTALLATION INSTRUCTIONS

Inner Cone Installation

Instructions related to the inner cone component during installation.

Introduction

MV-CONNEX Product Overview

Introduction to the MV-CONNEX dry pluggable connection system for medium voltage networks.

Silicone Material Properties

Details on silicone as a key material in medium voltage engineering and its benefits.

General Information

Installation Instructions Guidelines

Information regarding the proper use, understanding, and accessibility of installation instructions.

Contents of Installation Instructions

Overview of the sections covered within the installation instructions document.

Copyright Protection

Information on the confidentiality and protection of installation instructions content.

Liability, Warranty, and Guarantee

Manufacturer's liability, warranty provisions, guarantee terms, and spare parts policy.

Safety

General Safety Precautions

Covers intended use, operator responsibility, and product modification restrictions.

Workplace Safety and Personnel Requirements

Addresses risks, workplace safety, and qualifications for personnel.

Personal Protective Equipment (PPE)

Guidelines for necessary personal protective equipment during installation and operation.

Transport and Storage

Scope of Delivery

Information on checking delivery contents against the packing list.

Packaging

Details on the predominant packaging materials and disposal guidelines.

Storage Conditions

Rules for storing products, including temperature, humidity, and environment.

Storage Time

Information regarding the recommended storage duration for the product.

Disposal

Guidelines for environmentally sound disposal of product components.

Installation Accessories

Tools Required for Installation

Lists tools necessary for assembly and disassembly.

Recommended Tools and Accessories

Lists recommended tools and accessories for specific installation tasks.

Crimp Tools and Compression Sleeves

Details on round crimp tools and compression sleeves for cable termination.

Technical Data and Configuration

Dimensions, Weight, and Cable Data

Technical specifications including dimensions, weight, and cable parameters.

Product Characteristics

Electrical and performance characteristics of the product.

Configuration Components

Diagram and labels identifying product configuration parts.

Cable Quality

Cable Quality Checks

Criteria for checking cable eccentricity and flattening to ensure compatibility.

Installation and Assembly

Positioning and Cable Preparation

Initial steps for positioning the cable and preparing it for installation.

Cable Preparation Details

Detailed steps for cable preparation, including peeling and chamfering.

Assembly Procedure

Detailed step-by-step instructions for assembling the connector components.

Earth Connection

Procedure for connecting the earthing point of the system.

Vertical Installation

Specific requirements for installing the connector vertically from above.

Offshore/Ground Sealing Kit

Instructions for using an additional sealing kit for offshore or ground applications.

Thick Conducting Layer Handling

Specific steps for dealing with thick conducting layers during installation.

Dismantling and Removal

Dismantling Process

Step-by-step instructions for safely removing the connector.

Testing

Fittings and Blind Cap Mounting

Required fittings and procedure for mounting a blind cap for testing purposes.

Commissioning and Sheath Testing

Procedures for setting up commissioning tests and performing sheath testing.

Single Earthing

Earthing Options

Describes different options for single earthing connection based on network design.

Unplugging and Plugging In

Unplugging Procedure

Steps for safely unplugging the connector from the socket.

Plugging In Procedure

Steps for correctly plugging the connector into the socket.