EasyManua.ls Logo

Pitney Bowes FastPac DI950 - Connecting to Power; Powering up

Pitney Bowes FastPac DI950
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-2 SV61311 Rev. E
3 • Basic Operation
Press the ON/OFF switch (located below the Control Panel) to start the
power up process.
NOTE: If a High Capacity Sheet Feeder (HCSF) is present, power on before you
power on the base.
The system will automatically conduct a number of checks to verify the op-
erational integrity of the system. If any problems are detected, the system
will display information directing you to a solution to the problem.
NOTE: When power cycling the system, be sure to power cycle any optional add-
on equipment as well.
Powering Up
Connecting to
Power
WARNING! Read the safety information in Chapter 1 before con-
necting the system to power.
To connect the system to power:
1. Connect the power cord to the socket on the back of the machine.
2. Plug the power cord into a suitable power outlet. Make sure the power
outlet is near the machine and is easily accessible.

Table of Contents

Related product manuals